Challenge
The sunroom was an open shell with exposed framing, vaulted ceilings, and multiple windows that needed proper enclosure and finishing. The primary bathroom was gutted to studs and required complete tile installation on walls, proper waterproofing, and layout planning to make the space functional. Both rooms needed drywall finishing, electrical rough-in, and clean framing to move toward completion.



















